John Mackintosh Square Beautification

2004, Town Centre, £2m


 

Demolition and excavation of raised piazza down to side street level; excavation & installation of extensive infrastructure (services and drainage); road reinstatement in stone and concrete paving materials

Refurbishment & fitting out of Grille & Restaurant


DESIGN TEAM : Gov't of Gibraltar - Patrick Gomez

OUR ROLE : Principal Contractor

CLIENT : Government of Gibraltar

PRINCIPAL AGENT : Peter Carlin

PRINCIPAL QS : Gary Court


The Island

2007, Queensway, £2.6m


 

Excavation and construction of reinforced concrete basements for 19 houses; Suspended Ground floor slabs; Internal Blockwork partitions; External Infrastructure works: drainage & Services; Caisson capping; Earth retaining walls; Roads and paving; Cantilever bridge construction


DESIGN TEAM : Donaldsons & AKS

OUR ROLE : Principal Contractor

CLIENT : Marina Properties

PRINCIPAL AGENT : Peter Carlin

PRINCIPAL QS : Gary Court


Multi-User Games Area

2007, Victoria Stadium, £475k


 

The construction of multi-user games areas and childrens playing area within the Victoria Stadium Sports Complex. Works comprising of paving; specialist fence erection; Asphalt paving and specialist surfacing of playing surface; Drainage and services installation; Block paving.


DESIGN TEAM : Gov't of Gibraltar

OUR ROLE : Principal Contractor

CLIENT : Government of Gibraltar

PRINCIPAL AGENT : Peter Carlin

PRINCIPAL QS : Gary Court

ENGINEER : Andrew Nunn


Integrated Hospital Facilities

2004, £715k


 

Concrete Foundations, roadways, drainage, ducting; Other infrastructure work.


DESIGN TEAM : MoD

OUR ROLE : Sub- Contractor

CLIENT : MoD - Haymills Main Contractor

AGENT : Darren Warren

PRINCIPAL QS : Campbell Dickie

ENGINEER : Andrew Nunn


Victoria Stadium 'Additional Works' - Sports Areas

2006, £680k of £1.3m


 

Construction of multi-sports surfaces and areas: Excavation and earthworks; Services Infrastructure; Ground beams; Fencing; Paddle courts construction; Pontoon and mooring blocks; surfacing and block paving.


DESIGN TEAM : Gov't of Gibraltar

OUR ROLE : Subcontractor (Joint Venture)

CLIENT : Government of Gibraltar : Van Kessel (Main Contractor)

AGENT : Andrew Nunn

QS : Gary Court

ENGINEER : Andrew Nunn


The Anchorage

2008, South District, £650k


 

Underground & Surface drainage works; extensive importation and backfilling around foundations/structures


OUR ROLE : Sub-contractor

CLIENT : Volker Stevin (Main Contractor)

AGENT : Darren Warren

QS : Philip Montegriffo

ENGINEER : Andrew Nunn


Highways MTC - Major Works

2007, £1.4m


 

Maintenance of roads; Small Civil's Works; Paving etc. in various locations around Gibraltar


DESIGN TEAM : Gov't of Gibraltar

OUR ROLE : Principal Contractor

CLIENT : Government of Gibraltar

PRINCIPAL AGENT : Darren Warren

PRINCIPAL QS : Philip Montegriffo


The Sails

2009, Queensway Quay, £1m+


 

Caisson capping; construction of reinforced concrete retaining walls; RC Concrete ground slabs and beams; drainage and services infrastructure; enabling works.


DESIGN TEAM : Donaldsons & McClundies

OUR ROLE : Trade Contractor

CLIENT : Marina Properties Ltd

PRINCIPAL AGENT : Peter Carlin

PRINCIPAL QS : Gary Court

ENGINEER : Andrew Nunn